Property buyers and owners, commercial lending institutions and
developers realize the strict liability for cleanup and other costs
associated with property contaminated with hazardous wastes. Under
CERCLA, RCRA and state and local regulations, extensive cleanup
costs, liability and damages can be assessed if proper action is
taken.
All-Phase Environmental Consultants (APEC) provides our clients with
the information needed to make decisions on property conveyance and
clean-up actions by providing multidisciplinary resources, extensive
experience, leadership in the field and a history of successful
results through the following specialized services:
** A visual inspection of the subject property and contiguous
properties to identify areas of concern and/or potential problems
concerning the storage, handling and disposal of hazardous
substances.
** A review of historical public and private database listings to
determine the historic use of a property. This often includes the
review of local, state and federal government agency records, city
directories and fire insurance maps.
** A review of local and regional geological parameters to provide
data regarding expected ambient conditions on a property.
** Insightful, straightforward recommendations and concluding
statement. This statement either specifies additional
recommendations which the client can elect to perform to determine
if a property is contaminated (Phase II ESA) or states that a
property appears to be clear of environmental liability, this
allowing an individual to conclude a transaction offered under SARA.
Contact an environmental consulting specialist from All-Phase
Environmental Consultants. Our staff will provide you timely and
honest advice on what course of action is best suited for your
needs.
Our usual recommendation is to do historical research of the
property to find out if the underground storage tanks (UST’s) or
above ground storage tanks (AST’s) were removed. We then proceed by
requesting tank removal documentation from the environmental company
or contractor that performed the excavation.
If state regulated procedures were met and soil testing was done
then we can perform a simple Phase I environmental Site assessment
to assess if any surrounding properties have potentially affected
the Site. If proper documentation was not filed or if sampling was
not conducted at the time of the investigation we would then
recommend a limited Phase II Environmental Site Assessment which
includes the following:
** A Phase II (ESA) defines the nature and extent of areas of
concern identified in the Phase I (ESA) in order to more clearly
evaluate the true liability associated with the property. These
investigations may include soil-sampling, installation of
groundwater monitoring wells or perhaps further research into
records and uses of property.
** All-Phase Environmental Consultants Inc. has full service Phase
II capabilities. The firm can perform quality services to acquire
accurate results in an expedient matter. State of the art equipment
allows for fast, efficient sample and data collection.
You wouldn’t believe this but mold is becoming a growing concern not
only in semi-arid climates but all over the world. Several cases of
mold-related illness have been identified in the state of Colorado in just the past
year. If you are experiencing certain symptoms such as wheezing, or
runny nose and eyes, you may have been exposed to a mold that you
are allergic to. But not all allergies are caused by mold problems.
Molds give off toxins or poisons which some associate with many
non-allergic symptoms, including fatigue, memory problems, and
difficulty concentrating.
Potential signs and mitigating factors of a mold problem include:
** Stained ceiling tiles (you may be very surprised as to what may
be growing underneath) or walls.
** Musty, earthy, or urine scented odor.
** Black, brown, orange, pink, or green speckled walls or around any
plumbing grout or tile.
** Deficient siding, siding that is not covering a building
adequately, or certain types appear to be more prone to mold
** Wood not weather protected in lumberyards and prior or during
construction, and the wood becoming moist due to water intrusion,
humidity, etc. This is known as "lumberyard mold." (More information
on this below).
** Wood siding where the paint has cracked and water has intruded
(poor maintenance).
** Mild to severe unexplained illness, see symptoms, in combination
with any other building problems listed on this page.
** Swollen or crumbling walls or buckling floor boards.
** Sewer backup which has caused water damage.
** Leaky roof or flashing installed improperly.
** Flood damage.
** Leaky window or door.
** Washing machine overflow, washing machine leaks such as drain
valve flanges, leaky gaskets, etc.
** Leaky toilet seal or bathtub drainage problems.
** Lack of ventilation.
** Relative humidity over 55%.
** Damp basements.
All-Phase Environmental Consultants has qualified staff to verify
the indoor air quality of your house. We will help identify the type
of mold and what remediation steps should be taken to ensure a
healthy lifestyle.
Some of the major benefits include:
**Federal and/or state tax credits that either a builder or
homeowner can take advantage of through the Energy Star program. Not
to mention programs available through several utilities including
Xcel; Atmos, Source and Colorado Natural Gas; and the Governor’s
Energy Office.
**Improved comfort and lower utility bills are benefits any current
homeowner or prospective homebuyer can appreciate.
** An energy-efficient home can provide these and other advantages,
such as improved home durability.
** In addition, an energy-efficient home has less of an impact on
the environment, i.e. reduced carbon emissions as compared to a
typical house.
Certified RESNET HERS Energy Raters evaluate existing and new homes
and recommend energy efficiency improvements. Homeowners and
homebuyers can order an Energy Rating which is a good starting point
for determining the areas of a home to be improved.
Energy Efficient Mortgages give new homeowners more purchasing power
by taking into account the added value of an energy-efficient home,
while Energy Improvement Loans allow existing homeowners to roll the
costs of improving the energy-efficiency of their older home into
their home improvement loan.
There are now federal and in some cases state tax credits the
homeowner can utilize when making energy improvements to their
homes. Visit
www.energystar.gov or
www.irs.gov.
The data you get from conducting your own radon test with a device
purchased locally or provided by a local health department may be
precise and accurate enough to satisfy your needs.
The data you get from hiring a certified radon measurement
professional to collect your sample and have it analyzed will
provide you with additional peace of mind about the reliability of
the data. Throughout the course of the year, All-Phase’s radon
measurement professional will submit additional samples to the
contract laboratory (at no cost to you) to ensure the precision and
accuracy of the data from the lab. All-Phase will also make sure the
collection device is properly placed, is the best type of sampling
device for the application, and is only analyzed if the test
conditions for the building meet the requirements for the facility
use and for the length of the test period.
Yes, All-Phase has conducted radon surveys of entire school districts. We cater our reports to the needs of our client, so you can present the data as one large report or smaller reports for each building/location.
The EPA currently requires all SPCC Plans to be reviewed and recertified either every 5 years or whenever “there is a change in the facility design, construction, operation, or maintenance that materially affects it potential for a discharge” (whichever occurs first). All SPCC Plans are written to specifically address the current conditions and operational procedures at a facility. A change in the construction or operation of a facility may result in a facility putting itself at risk to releasing oil products to surface water bodies. In some cases, changes at a facility result in less stringent requirements in the SPCC Plan.