Completed Projects
Asbestos:

- St. Croix
U.S. Virgin Islands
Private Estate
Total Billing: $11,400
Client: Kirkland Construction
Rye, Colorado
Project Description:
- Performed an Asbestos Inspection on suspect materials affected by
future remodel, renovation, sale or purchase of the site and/or
demolition of various portions of the estate.
- Sampled numerous suspect materials
- Took corresponding photographs for each sample
- Prepared a written report detailing the sampling event
- Signed a Demolition Permit after the results were confirmed
- Worked with EPA officials and local building officials
Lead:
- 1042 E. Routt & 1027 Cedar
Pueblo, CO 81004
Total Billing: $27,000
Client: Pueblo City/County Health Department
Project Description:
- Conducted a preliminary lead-based paint assessment and inspection
of the residence
- Sampled peeling and chipping paint and soils
- Took corresponding photographs for each sample
- Prepared a grid diagram to document sampling procedures
- Wrote abatement plan for soil excavation and treatment
- Worked with CDPHE and local health officials on scope and health
and safety issues
Mold:
- Sharmar Village
1201 W. Abriendo Avenue
Pueblo, CO 81004
Total Billing: $1200
Client: Sharmar Village
c/o Janella Dickey
Project Description:
- Conducted a mold inspection and assessment of the nursing home
- Collected ambient air samples and cavity samples (wall and
ceiling)
- Prepared a written report detailing the sampling event
- Kept in contact with the client for any future questions or
concerns with the property
- Conduct post remediation sampling of areas affected by the water
leaks
Phase I:
- 401 W. Northern Avenue
Pueblo, CO 81004
Total Billing: $4,610
Client: Total Long-Term Care
c/o John Irons
200 E. 9th Avenue
Denver, CO 80203
Project Description:
- Went on Site and conducted a Phase I Environment Site Assessment
on the Property
- Researched information regarding the property including: Fire and
Health Department Interviews, ordered an Environmental Database
Report, Courthouse Chain of Title and Plat Maps, City Directories
Search, Historical Aerial Photographs Search, Topography Maps as
well as Soil Maps, A Site Map for the property and researched any
other information relative to the Site
- Compiled a detailed photo log of the property to be submitted with
the report
- Prepared a written report detailing the Phase I Environmental Site
Assessment and any conclusions and recommendations needed for the
Site
- Conducted ASTM non-scope items including an asbestos inspection;
lead-based paint inspection and radon testing
Phase II - Subsurface Soil and Groundwater Investigations:
- 1032 N. Franklin
Colorado Springs, CO. 80915
Total Billing: $255,110 (includes remediation)
Point of Contact: Colorado Springs School District 11
Project Description:
- Did an initial investigation and characterization of the facility
- Drilled and sampled subsurface boreholes to determine the extent
of contamination
- Set monitoring wells throughout the entire Site to monitor the
flow of contamination
- Prepared quarterly groundwater monitoring reports, Site
Characterization Reports and a Phase II Report for the client
- 4471 State Highway 165
Colorado City, CO
Total Billing: Ongoing
Point of Contact: Moore’s Valley Auto
Doug and Bruce Moore
Project Description:
- Did an initial investigation and characterization of the Site
- Drilled and sampled subsurface boreholes to determine the extent
of contamination
- Set monitoring wells throughout the entire Site to monitor the
flow of contamination
- Prepared quarterly groundwater monitoring reports, Site
Characterization Reports and a Phase II Report for the client
Phase III – Remediation:
- 1032 N. Franklin
Colorado Springs, CO. 80915
Total Billing: $255,110 (includes Phase II work)
Point of Contact: Colorado Springs School District 11
Project Description:
- Reviewed Phase II assessment data to determine most cost-effective
and efficient remedial action plan
- Implemented phased remedial action of Enhanced Fluid Recovery,
Chemical Oxidation, and Monitored Natural Attenuation
- Worked with the Colorado Division of Oil and Public Safety and
client for risk-based closure based on results of fate-and-transport
computer modeling of contaminant plume
- 4471 State Highway 165
Colorado City, CO
Total Billing: Ongoing
Point of Contact: Moore’s Valley Auto
Doug and Bruce Moore
Project Description:
- Reviewed Phase II assessment data and negotiated with regulatory
agency to determine most cost-effective and efficient remedial
action plan
- Implemented phased remedial action of Enhanced Fluid Recovery and
Soil Vapor Extraction/Low-flow Oxygen Injection with likely future
application of Chemical Oxidation to achieve remediation goals
Energy Audits – Existing and New Construction:
- La Junta Housing Authority
315 E. 5th Street
La Junta, CO 81050
Total Billing: $1,245
Point of Contact: La Junta Housing Authority
Tony Mascarenas
Project Description:
- Analysis of existing HVAC equipment; appliances; insulation types
and amounts; and windows
- Air leakage analysis with use of Blower Door equipment
- Analysis of details with RemRate software including recommended
upgrades with costs/benefit analysis
- Craftsman Homes & Design
172 E. Industrial Blvd., #104
Pueblo West, CO 81007
Total Billing: Ongoing for new construction
Point of Contact: Beverly Stevenart
Project Description:
- Analysis of plans for conception of energy efficient features
- Air leakage analysis with use of Blower Door equipment
- Duct leakage analysis with use of Ductblaster equipment
- Analysis of details with RemRate software including Energy Star
requirements; Built Green certification and tax credit
qualifications